MnM Power Solution Ltd.
  • HOME
  • ABOUT US
    • ABOUT MnM
    • SERVICES
    • OUR CLIENTS
    • MESSAGE FROM MD
    • BOARD OF DIRECTORS
  • PROJECT WORKS
    • COMPLETE
    • ONGOING
    • UPCOMING
  • CONSULTANTS
    • A M M Murtaza Ali
    • Md. Arjad Hossain
    • Engr. Md. Abdus Salam
    • Engr. Ahmed Jamal Khan Chowdhury
    • Md. Kamruzzan
  • PRODUCTS
  • CAREER
  • PHOTO GALLERY
  • CONTACT US
Select Page

Feasibility Study for 750KV Transmission Line from Moheshkhali Power Hub to Modunaghat 765 KV Substation.

Complete

Feasibility Study for 750KV Transmission Line from Moheshkhali Power Hub to Modunaghat 765 KV Substation.

Skills

Posted on

December 14, 2021

← Feasibility Study for Power Evacuation of Pabna 60 MW Solar Power Plant. Feasibility Study for 132 KV Transmission Line Route Survey and Power Evacuation of Sirajganj 68MW Solar Power Plant. →

MnM Power Solutions Ltd. was established in the year 2016 and has developed into a premier consultancy Organization providing consultancy from the stage of conceptualization to detailed planning, design and engineering for varied and diverse discipline of projects.

GET IN TOUCH

  • Flat-C-3, House-137, Road-04, Block-A, Banani, Dhaka-1213.
  • +88 01812435856
  • info@mnmpowersolutions.com

USEFUL LINK

  • Career
  • Services
  • About Us
  • Our Clients
  • Contact US
  • Project Works

Social Media

MnM Power Solutions Ltd.

  • Facebook
  • Twitter
  • Instagram
  • RSS

Copyright © 2021 MnM Power Solutions Ltd. all rights reserved. Developed by Advance Code Ltd.